École Secondaire Oak Bay High School – Measurement & Verification

  • Image Credit: HCMA Architecture + Design

  • Image Credit: HCMA Architecture + Design

  • Image Credit: HCMA Architecture + Design

In October, 2011 plans were announced to replace the existing school with a new $50 million facility to accommodate up to 1,300 students, including 100 international students, as well as a Neighbourhood Learning Centre. The existing 1957-era gymnasium will be converted into a performing arts theatre with support space for both school and community use. Construction began in the summer of 2013. The new building was completed for the start of the 2015-2016 school year.  The site work and removal of the old buildings is expected to be completed by 2016.  As of September 2015, the entire school has been finished, except for the artificial turf soccer field, and the new rugby pitch.

Project Statistics
Client
Farmer Construction
Project Type
K-12
Location
British Columbia
Vancouver Island
Size (m2)
17700
Rating System
LEED NC
Services
Measurement & Verification
Key Performance Indicators

TBD